How Italy actually makes its electricity50 Hz · 380 kV · Seven sources · Two islands

How Italy actually makes its electricity

Not the targets and not the press releases. The Alpine hydro that has run for a century, the Tuscan geothermal field that was first in the world, solar in the south, wind on the ridges, the coal stations closing — and what is actually turning at four in the morning.

How to read this

Blue marks anything measured. Red marks anything ending. Where a figure is unpublished the column stays empty rather than being filled.

The first commercial geothermal station in the world opened on this ground. The field is still on the network.Photo: Larderello 002.JPG · Wikimedia Commons

Geothermal · The field that was first

Larderello Was First

The Tuscan field where geothermal electricity was generated before anywhere else, and why the geology there permits it. What a dry-steam field is, how the wells are managed, and why this technology stayed regional rather than spreading.

Seven things make the electricity

At four in the morning, in the right-hand column

No.SourceWhat it is, physicallyAt 04:00
01GasThe combined-cycle fleet, following demand hour by hour.Held on, part load
02HydroAlpine reservoirs, run-of-river, and pumped storage.Pumping
03GeothermalSouthern Tuscany only. Around 900 MW, roughly 6,000 GWh a year.Flat
04SolarGround-mount in the south, and rooftop in its thousands.Zero
05WindRidges and coastal plain south of Rome, and both islands.Weather
06CoalA closure programme with a date attached; Sardinia later.Phase-out
07ImportsAcross the Alpine border, scheduled and priced hourly.Importing

Four in the Morning

The hour that tests a grid: no sun, low wind, low demand but not zero. What is actually running, and why that answer is the honest measure of a transition.

Where the machines are

Filed by source, plotted on the country

LarderelloBrindisiSardinia windAlpine hydroSicily solarMilan
Generating sites by source, and the demand centre the network has to reach. Drawn from real coordinates.

Point at a row to find it on the map. A reader can see which regions carry which generation, and the stations on the closure list sit on the same map as what is replacing them.

04:00

What is running when the sun is down

Read the piece

Gas, at part load

Grids, operators and research bodies whose interest in how Italy generates, balances and delivers power runs as deep as ours.

Water, held or pumping

Run-of-river keeps going because the river does. Reservoir and pumped storage are mostly buying the trough, lifting water uphill to sell it back at the evening peak.

Geothermal, flat

The Tuscan fields run at close to full output around the clock, indifferent to the weather and to the hour.

Imports, over the Alps

A scheduled quantity arriving across the border, carrying whatever the difference turns out to be.

Everything on the site

Browse all 21 pieces

01

Geothermal

Larderello, and the field that was first in the world.

All 4 pieces

  1. 01Larderello Was FirstMarta Ferretti · 6 min
  2. 02What a Wellhead Actually DoesDaniel Kroll · 3 min
  3. 03Geothermal Runs All NightChiara Bassani · 4 min
  4. 04Reinjection, and Why the Field Does Not Run OutOwen Petrie · 5 min

02

Hydro

A century of Alpine storage, and what pumping is for.

All 4 pieces

  1. 01A Century of Alpine StorageSilvia Marchetti · 7 min
  2. 02Pumped Storage Is the Grid's Only Real BatteryMarta Ferretti · 7 min
  3. 03Run-of-River, and Why It Is Not StorageDaniel Kroll · 3 min
  4. 04What a Dry Year DoesChiara Bassani · 3 min

03

Wind & Solar

The south, the ridges, and what intermittent means.

All 5 pieces

  1. 01The South Carries the SunOwen Petrie · 6 min
  2. 02Wind Lives on the RidgesSilvia Marchetti · 5 min
  3. 03Intermittent Is Not the Same as UnreliableMarta Ferretti · 7 min
  4. 04The Evening Is the Hard PartDaniel Kroll · 3 min
  5. 05Rooftop Against FieldChiara Bassani · 4 min

04

Gas & Coal

What runs at four in the morning, and what is closing.

All 4 pieces

  1. 01Four in the MorningOwen Petrie · 6 min
  2. 02Phasing Out the Coal StationsSilvia Marchetti · 7 min
  3. 03Gas Is the SwingMarta Ferretti · 3 min
  4. 04Capacity Is Not EnergyDaniel Kroll · 3 min

05

The Network

Imports, interconnectors and moving power north to south.

All 4 pieces

  1. 01Moving Power North to South, and BackChiara Bassani · 6 min
  2. 02The InterconnectorsOwen Petrie · 3 min
  3. 03What the System Operator Is Doing All DaySilvia Marchetti · 5 min
  4. 04Sicily and Sardinia: Grids at the End of a WireMarta Ferretti · 3 min